
9th January 2025
17th February 2022
Collaborating with Domus Facades Ltd, GSE undertook detailed assessment of the as built structure considering the proposed enabling works required to facilitate façade alterations (Installation of New Clad Structure). Minimising disturbance to the hotel was a critical parameter as it remained in service throughout the works.
With close coordination and collaboration with scaffold designer, scaffold contractor & main contractor, we managed to deliver a combined design that was suitable for the site.
See below for before & after photos.