Design package facilitating the demolition of all internal structure and basement construction
Construction Engineering & Temporary Works – Lancaster Mews
A temporary works design package was produced facilitating the demolition of all internal structure and basement construction. Our design ensured temporary support to the existing shell whilst maintaining positive restraint at existing structural levels utilising waling frames, racking props and bracing elements. In addition to this we specified the sequencing and temporary works design for the two stage underpin construction.
Construction Engineering & Temporary Works – RAF Club
Demolition of the North West wing, involving loading platform, crane base design, mobile crane assessment and sequence of demolition minimising... > Read moreConstruction Engineering & Temporary Works – RAF Club
Construction Engineering & Temporary Works – Nile Street
GSE were initially appointed to provide support to McLaren Construction with party wall issues. Following successful interaction with... > Read moreConstruction Engineering & Temporary Works – Nile Street
Construction Engineering & Temporary Works – Wetherby Gardens
Major works were proposed to this grand six story property in Gloucester Rd, London. The entire internal structure... > Read moreConstruction Engineering & Temporary Works – Wetherby Gardens
Construction Engineering & Temporary Works – Chepstow Crescent
GSE was appointed to design the permanent works including below ground drainage for the basement and renovation of this... > Read moreConstruction Engineering & Temporary Works – Chepstow Crescent
Construction Engineering & Temporary Works – Langley Park House Hotel
Our advice and design services were required for loading platform design, crash deck, temporary support to existing vaults and arches, ground floor structure and first floor... > Read moreConstruction Engineering & Temporary Works – Langley Park House Hotel
Construction Engineering & Temporary Works – Southbank House
GSE were on board early in the project and helped to coordinate structural information between the contractor and the... > Read moreConstruction Engineering & Temporary Works – Southbank House
Construction Engineering & Temporary Works – Smith Street
Temporary works for demolition of the internal walls, floors and façade retention. The original buildings were destroyed by bombing... > Read moreConstruction Engineering & Temporary Works – Smith Street
Construction Engineering & Temporary Works – Lancaster Mews
A temporary works design package was produced facilitating the demolition of all internal structure and basement construction. Our... > Read moreConstruction Engineering & Temporary Works – Lancaster Mews
Construction Engineering & Temporary Works – Birmingham O2 Arena
Independent 3rd party review of the temporary stability of the North and South stability cores during construction. The... > Read moreConstruction Engineering & Temporary Works – Birmingham O2 Arena
GET IN TOUCH
Contact us today to discuss a project or find out
more about how we can work together
CONTACT US
Tweet deck
Our latest news up-to-date
Something went wrong with the twitter. Please check your credentials and twitter username in the twitter settings.