Project Summary:

Design the temporary works to maintain the stability of the front facade and party walls of the property during construction

Chepstow Crescent

GSE was appointed to design the permanent works including below ground drainage for the basement and renovation of this terraced house in Notting Hill. The proposed works included a single story basement and complete removal of all the floors, roof, closet wing and back wall of the main house which would then be reinstated with new structure. Following on from these, GSE was asked to design the temporary works to maintain the stability of the front facade and party walls of the property during construction. As the property was part of a terrace, the stability of the neighbouring properties was also to be considered and maintained.

Other Case Studies

Chester Square

Green Structural Engineering have been appointed to prepare the Structural Methodology Statement for this Chester Square property. The proposed works... > Read more

Chester Square

RAF Club

Demolition of the North West wing, involving loading platform, crane base design, mobile crane assessment and sequence of demolition minimising... > Read more

RAF Club

Nile Street

GSE were initially appointed to provide support to McLaren Construction with party wall issues. Following successful interaction with... > Read more

Nile Street

Wetherby Gardens

Major works were proposed to this grand six story property in Gloucester Rd, London. The entire internal structure... > Read more

Wetherby Gardens

Chepstow Crescent

GSE was appointed to design the permanent works including below ground drainage for the basement and renovation of this... > Read more

Chepstow Crescent

Langley Park House Hotel

Our advice and design services were required for loading platform design, crash deck, temporary support to existing vaults and arches, ground floor structure and first floor... > Read more

Langley Park House Hotel

Southbank House

GSE were on board early in the project and helped to coordinate structural information between the contractor and the... > Read more

Southbank House

Smith Street

Temporary works for demolition of the internal walls, floors and façade retention. The original buildings were destroyed by bombing... > Read more

Smith Street

Lancaster Mews

A temporary works design package was produced facilitating the demolition of all internal structure and basement construction. Our... > Read more

Lancaster Mews

Birmingham O2 Arena

Independent 3rd party review of the temporary stability of the North and South stability cores during construction.  The... > Read more

Birmingham O2 Arena