Emaleigh Coles
June 30, 2022

Case Study – Mulberry Walk, Chelsea

GSE have been appointed to undertake the integrated services design of structural works, temporary works and civil engineering design.

The project is underway in the initial stages, with GSE developing the structural scheme prior to undertaking detailed design. The next stage will include design workshop with the architects to optimise the structural scheme.