admin
August 10, 2016

Langley Park House, Temporary Works.

GSE were instructed to provide the temporary works design to allow strengthening of the existing timber beams at Langley Park House. Due to the floor construction, grade II listed ceilings and cornices, it was unfeasible to prop the beams from below to provide temporary support. Therefore the beam and floors had to be hung from above the second floor temporarily, to allow the timber beam to be cut and steel plate to be inserted to strengthen as per the structural engineers design.

Langley House Park

 

Gunnersbury Lane Apartments, Acton, London.

Green Structural Engineering is pleased to announce their appointment as structural engineering consultants in conjunction with Barroerock Construction and BYDS Associates on a new block of flats on Gunnersbury Lane in Acton, London.

The construction will comprise a four story RC framed building. GSE will design the RC frame, below ground drainage and temporary works to facilitate the construction.

We look forward to working on this exciting and prestigious project with Barroerock.

Gunnersbury LaneGunnersbury Lane

 

 

Malvern Rd Apartments, Maida Vale, London.

Green Structural Engineering is pleased to announce their appointment as structural engineering consultants in conjunction with Doveberry and Arktec Architectural Consultancy on a new block of flats on Malvern Rd in Maida Vale, London.

The construction will comprise a five story RC framed building of 9 high spec apartments. GSE will design the RC frame, below ground drainage and temporary works to facilitate the construction.

We look forward to working on this exciting and prestigious project with Doveberry.

Malvern Rd Malvern Rd