Our Lady & St Philip Our Lady & St Philip
Our Lady & St Philip Our Lady & St Philip

Location:

Sydenham

Architect & Contractor:

The Darwin Group Ltd

Project Summary:

Modular steel frame building on pile foundations

Education – Our Lady & St Philip Neri School

Construction of a new three-storey primary school with a construction cost of circa £3 million. The school consisted of 14 classrooms, library and double height assembly hall. The works included a piled concrete substructure with a modular steel frame superstructure. The floors were constructed using composite metal deck with fibre reinforced concrete.

The construction materials used allowed for a very fast construction programme. The design was also carried out in a short amount of time at the behest of the client.

GSE designed the piled foundations and ground beams, steel frame plus below ground drainage. GSE also developed a piling strategy that minimised pre-construction works i.e. piling mats.

Other Case Studies

Education – Our Lady & St Philip Neri School

Construction of a new three-storey primary school with a construction cost of circa £3 million. The school consisted... > Read more

Education – Our Lady & St Philip Neri School

Education – Trailfinders Pavilion

The project involved constructing a new 2 storey nursery with a large floor space and mezzanine level. We were... > Read more

Education – Trailfinders Pavilion

Education – Stamford Raffles Campus

Refurbishment and extension of an existing school building and new build classroom block. GSE were selected to design the... > Read more

Education – Stamford Raffles Campus

Education – St Jerome School

GSE was appointed to undertake the drainage design and the structural design for the conversion of an existing 1980’s... > Read more

Education – St Jerome School

Education – Feltonfleet School

Feltonfleet School is an independent day and weekly boarding co-educational preparatory school for children, with a 400-pupil capacity. The... > Read more

Education – Feltonfleet School