RAF Club RAF Club RAF Club RAF Club RAF Club
RAF Club RAF Club RAF Club RAF Club RAF Club

Location:

Piccadilly

Client:

Alcema and Macai Projects

Project Summary:

Demolition of the North West wing, involving loading platform, crane base design, mobile crane assessment and sequence of demolition minimising temporary works requirement

Construction Engineering & Temporary Works – RAF Club

Demolition of the North West wing, involving loading platform, crane base design, mobile crane assessment and sequence of demolition minimising temporary works requirement.

Other Case Studies

Construction Engineering & Temporary Works – RAF Club

Demolition of the North West wing, involving loading platform, crane base design, mobile crane assessment and sequence of demolition minimising... > Read more

Construction Engineering & Temporary Works – RAF Club

Construction Engineering & Temporary Works – Nile Street

GSE were initially appointed to provide support to McLaren Construction with party wall issues. Following successful interaction with... > Read more

Construction Engineering & Temporary Works – Nile Street

Construction Engineering & Temporary Works – Wetherby Gardens

Major works were proposed to this grand six story property in Gloucester Rd, London. The entire internal structure... > Read more

Construction Engineering & Temporary Works – Wetherby Gardens

Construction Engineering & Temporary Works – Chepstow Crescent

GSE was appointed to design the permanent works including below ground drainage for the basement and renovation of this... > Read more

Construction Engineering & Temporary Works – Chepstow Crescent

Construction Engineering & Temporary Works – Langley Park House Hotel

Our advice and design services were required for loading platform design, crash deck, temporary support to existing vaults and arches, ground floor structure and first floor... > Read more

Construction Engineering & Temporary Works – Langley Park House Hotel

Construction Engineering & Temporary Works – Southbank House

GSE were on board early in the project and helped to coordinate structural information between the contractor and the... > Read more

Construction Engineering & Temporary Works – Southbank House

Construction Engineering & Temporary Works – Smith Street

Temporary works for demolition of the internal walls, floors and façade retention. The original buildings were destroyed by bombing... > Read more

Construction Engineering & Temporary Works – Smith Street

Construction Engineering & Temporary Works – Lancaster Mews

A temporary works design package was produced facilitating the demolition of all internal structure and basement construction. Our... > Read more

Construction Engineering & Temporary Works – Lancaster Mews

Construction Engineering & Temporary Works – Birmingham O2 Arena

Independent 3rd party review of the temporary stability of the North and South stability cores during construction.  The... > Read more

Construction Engineering & Temporary Works – Birmingham O2 Arena