Project Summary:

Loading platform design, crash deck, temporary support to existing vaults and arches, ground floor structure and first floor structure

Construction Engineering & Temporary Works – Langley Park House Hotel

Our advice and design services were required for loading platform design, crash deck, temporary support to existing vaults and arches, ground floor structure and first floor structure. We were faced with various design challenges due to the age of the structure and conditions of consent based on the Grade II listing of the building. These included “no trimming, demolition or damage can be inflicted on any of the existing fabric of the structure.” This was overcome through clear instruction to the contractors and effective design and detailing.

Other Case Studies

Construction Engineering & Temporary Works – RAF Club

Demolition of the North West wing, involving loading platform, crane base design, mobile crane assessment and sequence of demolition minimising... > Read more

Construction Engineering & Temporary Works – RAF Club

Construction Engineering & Temporary Works – Nile Street

GSE were initially appointed to provide support to McLaren Construction with party wall issues. Following successful interaction with... > Read more

Construction Engineering & Temporary Works – Nile Street

Construction Engineering & Temporary Works – Wetherby Gardens

Major works were proposed to this grand six story property in Gloucester Rd, London. The entire internal structure... > Read more

Construction Engineering & Temporary Works – Wetherby Gardens

Construction Engineering & Temporary Works – Chepstow Crescent

GSE was appointed to design the permanent works including below ground drainage for the basement and renovation of this... > Read more

Construction Engineering & Temporary Works – Chepstow Crescent

Construction Engineering & Temporary Works – Langley Park House Hotel

Our advice and design services were required for loading platform design, crash deck, temporary support to existing vaults and arches, ground floor structure and first floor... > Read more

Construction Engineering & Temporary Works – Langley Park House Hotel

Construction Engineering & Temporary Works – Southbank House

GSE were on board early in the project and helped to coordinate structural information between the contractor and the... > Read more

Construction Engineering & Temporary Works – Southbank House

Construction Engineering & Temporary Works – Smith Street

Temporary works for demolition of the internal walls, floors and façade retention. The original buildings were destroyed by bombing... > Read more

Construction Engineering & Temporary Works – Smith Street

Construction Engineering & Temporary Works – Lancaster Mews

A temporary works design package was produced facilitating the demolition of all internal structure and basement construction. Our... > Read more

Construction Engineering & Temporary Works – Lancaster Mews

Construction Engineering & Temporary Works – Birmingham O2 Arena

Independent 3rd party review of the temporary stability of the North and South stability cores during construction.  The... > Read more

Construction Engineering & Temporary Works – Birmingham O2 Arena